GB/T 17645.42-2013
工业自动化系统与集成 零件库 第42部分:描述方法学:构造零件族的方法学
Industrial automation systems and integration - Parts library - Part 42: Description methodology: Methodology for structuring parts families
- 实施日期
- 2014-03-15
- ICS 分类
- 35.240.50;25.040.40
组合使用关键词、标准类型、状态与 ICS 分类,快速定位所需国家标准。
找到 280 条
GB/T 17645.42-2013
Industrial automation systems and integration - Parts library - Part 42: Description methodology: Methodology for structuring parts families
GB/T 29826-2013
Cloud manufacturing - Terminology
GB/Z 29014-2012
Cutting tool data representation and exchange - Definitions, principles and methods for reference dictionaries
GB/T 28847.1-2012
Building automation and control systems - Part 1:Summarize
GB/T 28847.3-2012
Building automation and control systems - Part 3:Function
GB/T 28847.2-2012
Building automation and control systems - Part 2:Hardware
GB/T 26337.2-2011
Supply chain management - Part 2:SCM terms
GB/T 28040-2011
Maintenance specification for product data dictionary
GB/T 26789-2011
Product lifecycle management services specification
GB/T 26498-2011
Industrial automation systems and integration - Physical device control - Dimensional Measuring Interface Standard (DMIS)
GB/Z 26337.1-2010
Supply chain management - Part 1:Overview and basic principle
GB/T 21099.3-2010
Function block (FB) for process control - Part 3:Electronic device description language (EDDL)
GB/T 26221-2010
Condition - based maintenance system architecture
GB/T 26335-2010
Specification of industry enterprise informationization integration system
GB/T 26327-2010
Implementation guide for enterprise informationization system integration
GB/T 25109.4-2010
Enterprise Resource Planning - Part4: ERP system architecture
GB/T 20720.3-2010
Enterprise-control system integration - Part 3: Activity models of manufacturing operations management
GB/T 25654-2010
Embedded software API for handheld electronic product
GB/T 25508-2010
Evaluating specification for ASP service of manufacturing enterprise
GB/T 25489-2010
Technical specification for the functional planning of networked manufacturing system