GB/Z 36271.3-2026
Power installations exceeding 1 kV AC and 1,5 kV DC—Part 3: Principles to be observed in the design and erection of high voltage installations—Safety of high voltage installations
- 实施日期
- —
- ICS 分类
- 29.020;29.080.01
GB/T 311.14-2024
Insulation co-ordination—Part 14: Insulation co-ordination for AC/DC filters of HVDC system
- 实施日期
- 2024-10-01
- ICS 分类
- 29.080.01
GB/T 42001-2022
Altitude correction method for external insulation flashover voltage of high voltage power transmission projects
- 实施日期
- 2023-05-01
- ICS 分类
- 29.080.01
GB/T 36271.1-2018
Power installations exceeding 1kV a.c.—Part 1:Common rules
- 实施日期
- 2019-01-01
- ICS 分类
- 29.020;29.080.01
GB/T 28541-2012
Insulation co-ordination for equipments of ±800kV high voltage direct current converter stations
- 实施日期
- 2012-11-01
- ICS 分类
- 29.080.01
GB/T 311.4-2010
Insulation co-ordination - Part 4: Computational guide to insulation Co-ordination and modeling of electrical networks
- 实施日期
- 2011-05-01
- ICS 分类
- 29.080.01
GB/T 17948.3-2006
Functional evaluation of insulation systems for rotating electrical machines - Test procedures for form-wound windings - Thermal evaluation and classification of insulation sysyems used in machines up to and including 50MVA and 15kV
- 实施日期
- 2006-06-01
- ICS 分类
- 29.080.01;29.160.01
GB/T 17948.2-2006
Functional evaluation of insulation systems for rotating electrical machines - Test procedures for wire-wound windings - Classification of changes and insulation component substitutions
- 实施日期
- 2006-06-01
- ICS 分类
- 29.080.01;29.160.01
GB 17622-1998
General specification for insulating--Gloves for live working
- 实施日期
- 1999-08-01
- ICS 分类
- 29.080.01
GB 17620-1998
General specification for insulating rigid ladder for live working
- 实施日期
- 1999-08-01
- ICS 分类
- 29.080.01